The Barakah Nuclear Energy Plant's Unit 1 is now operating at 80 per cent capacity.
The facility in Abu Dhabi's Al Dhafra region has been gradually raising the reactor's power levels while collecting data and fine-tuning safety and control systems.
Throughout this process, known as Power Ascension Testing (PAT), the systems of Unit 1 are monitored and tested to ensure their compliance with national regulatory requirements and the highest international standards of safety, quality, security and reliability.
The PAT is being conducted under the supervision of the UAE’s independent nuclear regulator, the Federal Authority for Nuclear Regulation (FANR), which has carried out more than 280 inspections since the start of Barakah’s development.
These national reviews have been supported by more than 40 assessments and peer reviews by the International Atomic Energy Agency (IAEA) and World Association of Nuclear Operators (WANO).
The operations team at Unit 1 are now working to increase the plant’s electricity production to 100 per cent capacity, marking the final stage of PAT.
Following the achievement of 100 per cent power, Unit 1 will be gradually shut down to enable the commencement of a Check Outage.
During the Check Outage, which takes place over a period of several months, Unit 1’s systems will be carefully examined, and any planned or corrective maintenance will be performed to ensure its safety and reliability prior to the commencement of commercial operations.


UAE says OPEC, OPEC+ exit was sovereign strategic decision
UAE reaffirms it took defensive actions to protect sovereignty, civilians
Gulf educators gather in Dubai to share teaching and innovation ideas
UAE refutes Iranian allegations at BRICS meeting
Dubai to launch drone delivery services at parks, beaches
UAE, India ink defence, energy partnerships as Sheikh Mohamed meets Modi
UAE issues advisory over Danalac infant formula
H.H. Sheikh Mohammed opens DEWA's 'largest, smartest net-zero energy' HQ
UAE to restore Umayyad Mosque in Syria's Damascus
WATCH: Dubai driver caught for reckless stunts on high-speed highway
UAE brokers new round of Russia-Ukraine prisoner exchange
H.H. Sheikh Khaled briefed on West-East oil pipeline project
Dubai's RTA impounds over 9,000 cars in 2025 for illegal parking
UAE condemns attack on Indian-flagged ship off Oman coast
UAE, UK ministers discuss regional stability, bilateral ties
H.H. Sheikh Hamdan reviews operations, developments at Jebel Ali Port
Drugs hidden inside passenger’s body seized at Abu Dhabi Airport
UAE President, Montenegro PM discuss stronger bilateral cooperation
Fujairah says pipeline work triggered fire in petroleum industries area
Yas Island announced as location for Sphere Abu Dhabi project
